must have fallen into inextricable confusion.
may add that Mr Pape feels
that as
I
Director of the Public Works he should not be Paymaster for them.
I have the honor to be,
Your Excellency's most obedient,
humble Servant-
Arthellen
Auditor :
211
Memoranda of the relative cost of Public Works in the Surveyor General's Department,
when executed under Contract and when carried on by day work
Road from Wong nei ching to Bokun poo executed by Contract by Cunninghame (English Contractor) for $2000. This line of Road (for facility of execution, the small number, and inexpensive construction of the Drains, may be classed with the lowest cost of formation) on the Shuck pai wan Road excepting that the former is 31 feet and the latter 15 feet wide, which difference should diminish the cost, (the side Drains being the same in both instances) say by this.
Soo kumpoo Road.
The whole length is 809 yds @ $2.5.47 per yd. is $2,000 Loss & this for 24 ft width 18.486m.
Shuck-pai-wan Road.
must have fallen into inextricable confusion.
may add that Mr Pape feels
that as
I
Director of the Public Works he should not be Paymaster for them.
I have the honor to be,
Your Excellency's most obedient,
humble. Servant-
Arthellen
Auditor :
211
Memoranda of the relative cost of Public Works in the Surveyor General's Department,
when executed under Contract and whe carried on by day work
Road from Wong nei ching to Bokun poo executed by Continct by Cunninghame (English Contract
tractor / for $ 2000. This line of Road for
facility of execution, the small number; and
inexpensive construction of the Drains, may
be classed with the lowest cost of formation) on the Shuck pai war Road excepting thai
the former is 31 pet and the latter 15 feet wide, which difference should diminish the cest, (the side Drains de bring the same in both instances) say & this.
Soo kumpoo Roadr
The whole length is 809 yds @ 2.5.47hts is $2.000 Loss & this for 24 tra width 18 486m per yd.
Shuck-pai-wan Road.